Parks Board balks at estimated pool repair, operating costs

The Parks Board discussed an engineer’s estimate on the cost to repair, bring up to code, and operate the pool at their Dec. 13 meeting.

Members of the Parks and Recreation Advisory Board were unsatisfied with an engineer’s evaluation of Devine Swim Club, Inc.’s pool as presented at a Parks Board meeting on Wednesday, Dec. 13.
Continue reading “Parks Board balks at estimated pool repair, operating costs”